Jody and I met with the builder this past week to do a walk through on the house. At this point the plumbing, wiring, and insulation are done. There were a few things here and there that needed to be fixed, but overall the home is coming along and is on schedule if not a little ahead.

Installation and finishing of dry wall should be done in the next 5-7 days. After the dry wall is installed they will then bring in the cabinets. According to the builder the cabinet installation takes a day. Once the cabinets are installed we should be ready to close on the house in 45 days. So we are probably looking to move in to the house around the 3rd or 4th week of January.

Here is an exciting picture of the insulation.